Skip to content
Rivac Labs
All work

We're a new agency — this is an illustrative example of how a project like this runs with us, not completed client work. No client name, no invented results — just the plan, step by step.

Hours to days

Production Incident Response

A minutes-to-hours support engagement when something's broken in production, with a written post-mortem afterward.

How We'd Run It

The same six steps, applied to this project

  1. 1

    Diagnose

    We get access to logs, monitoring, and recent changes immediately and identify the likely root cause before touching anything in production.

  2. 2

    Pilot

    We apply the smallest fix that stabilizes production first, as a contained, reversible change, and confirm it resolves the underlying cause rather than just the symptom.

  3. 3

    Review, Together

    We walk the client through what broke, why, and what the fix does in plain terms before considering any further, non-urgent changes.

  4. 4

    Build

    If the incident exposes a deeper gap, we scope and build the more durable fix beyond the immediate patch.

  5. 5

    Launch, With a Human on Every Send

    We deploy the verified fix with a human watching the relevant metrics and logs in real time to confirm it holds.

  6. 6

    Operate & Improve

    We deliver a written post-mortem with root cause and prevention steps, and monitor the affected system more closely for a period afterward.

Typical Timeline

A rough phase-by-phase breakdown

A target shape for a project like this, not a narrated account of a specific past engagement — actual pacing depends on scope and how quickly decisions get made.

  1. 1

    Diagnose & Triage

    First 30-60 minutes

    Get access to logs, monitoring, and recent changes, and identify the likely root cause before touching production.

  2. 2

    Pilot Fix

    Hours 1-3

    Apply the smallest reversible fix that stabilizes production and confirm it resolves the underlying cause, not just the symptom.

  3. 3

    Review Together

    Same day

    Walk the client through what broke, why, and what the fix does before considering any further, non-urgent changes.

  4. 4

    Build the Durable Fix

    Following 1-2 days, if needed

    Scope and build a more durable fix if the incident exposed a deeper gap beyond the immediate patch.

  5. 5

    Launch / Deploy

    As soon as the fix is verified

    Deploy the verified fix with a human watching metrics and logs live to confirm it holds.

  6. 6

    Post-Mortem & Operate

    Within a few days after

    Deliver a written post-mortem with root cause and prevention steps, and monitor the system more closely for a period afterward.

What's Included

What an engagement like this covers

  • Immediate access to logs, monitoring, and recent deploy history

  • One clear point of contact for the duration of the incident

  • A contained, reversible fix aimed at the confirmed root cause, not just the symptom

  • A human watching the relevant metrics and logs in real time as the fix deploys

  • A written post-mortem with root cause and concrete prevention steps

  • A period of closer monitoring on the affected system afterward

Where Projects Like This Go Wrong

Common pitfalls, and how we handle them

  • Chasing symptoms and shipping a quick patch without confirming the real root cause, so the same failure recurs later

  • No clear single point of contact during the incident, so decisions and status updates get duplicated or lost across channels

  • Fixing the immediate outage but skipping the post-mortem, so the same class of failure isn't prevented next time

Targets, Not Results

What we consider success

These are the targets we'd work toward on a project like this — not results we're claiming to have already achieved.

  • Production restored to a stable, working state with the fix verified against the real failure, not just the visible symptom

  • One clear point of contact and a running status update throughout, so the client always knows where things stand

  • A written post-mortem delivered afterward with root cause, what was changed, and concrete steps to prevent recurrence

Have a project like this in mind?

Tell us where you are and we'll help you find the highest-leverage place to start — scoped small enough to prove itself before you commit to anything bigger.

Talk to us about a project like this
Questions? Book a free call